Passage 1
Holst and Company, a member of the Northwest Holst Group, has introduced flexible working hours for all its staff at its head office. It claims to be the first UK construction company to do this. The three-month trial period is being con
Passage 1
Holst and Company, a member of the Northwest Holst Group, has introduced flexible working hours for all its staff at its head office. It claims to be the first UK construction company to do this. The three-month trial period is being conducted with the approval of the overwhelming majority of the head offices. All 150 employees must be at their job during the “core time” from 10 am to 4 pm, less a one-our lunch break. They may choose arrival and departure times from 8 to 10 am and 4 to 6 pm. 150 hours have to be put in over each four week period. Credit or debit time of up to 7 and 1/2 hours may be carried forward to the next four-week period. Hengstler Flextime recording equipment is being used for the trial. The managing director of Holst, Mr Colin Cashmore, commented, “This is an exercise in responsibility. We regard our staff as very responsible people and it is only on this basis that the flexible working hours system can succeed.” He emphasized that if after the trial a majority of the staff was opposed to the system, it would not be continued. If, on the other hand, it proved successful, the company would consider extending Flextime to its other offices throughout the country.
Statements:
43.Every employee must be at his or her job during the “core time” from 10 am to 4 pm, including a one-hour lunch break.
A、True
B、False
【正确答案】:B
【名师解析】:根据文章内容,所有员工在"核心时间",即上午10点到下午4点期间必须在岗,但这段时间内包含了一小时的午餐休息时间。因此,题目中的说法"Every employee must be at his or her job during the 'core time' from 10 am to 4 pm, including a one-hour lunch break."是错误的。正确的表述应该是在"核心时间"内,员工必须在岗,但不包括午餐休息时间。所以答案是B. False。
Top